[ Chinese wardrobe network ] The overall wardrobe production process is different from the general purchase of panel furniture. First of all, the designer will have a close contact and communication with the user, understand the user's hobbies and their home style, and then measure the door and design a reasonable one. The overall wardrobe . During this period, the designer will provide a computer rendering, and after the user is satisfied, the overall wardrobe will be made from the assembly line according to the drawings.

1. Use a cloth to place the floor, first assemble from the wide side panel against the end of the wall, and lay the wide side panel on the ground (maintain 700mm away from the rear wall). First, put the plate of the filled three-in-one rubber plug on the cloth, check the hole spacing and the drawing, and install the three-in-one single-link. Then the solid layer is nailed to the cork, fixed on the wide side plate, the top handle with the large handle hole facing upward, the other solid layers are facing downward, and the foot line large handle hole is facing inward (the middle solid layer is consistent with the L frame height, that is, the bottom plate to the solid layer The inner space is 960mm, and the hole is drilled on site.) Put the side panels, nail the cork, and the cork is required to connect the solid layers on both sides. Install the double connecting rod on the second cabinet. Note that the large handle on the double connecting rod can only lock half, that is, 90°. When the two solid layers are fixed to the side plates, tighten the large handles at the same time. Repeat the installation steps for the second cabinet when installing the third cabinet.

2. Nail back plate. Place the assembled whole cabinet on the floor of the point cloth, and lay the side panels in the same plane. Use a slider to measure the diagonal size of the cabinet and adjust it to the same level. Start with the first backing plate from the wide measuring board. Note that if there is a solid nail in the middle, draw the center line of the solid layer with a pencil and nail it. nail.

3. Installation of the L frame. Use the side plates of the L frame to have a parallel line on the corresponding side plates, then move the center line of the three-in-one rubber particles up by 9 mm, and draw a parallel line on the corresponding bottom plate with the top frame of the L frame. The inner center 9mm draws the center line of three rubber pieces. The hole was drilled with a 10 mm drill bit and the hole depth was 10-20 mm. Install a single pole. After the L frame is installed, nails are fixed on the back plate.

4. Clean up the wardrobe installation debris, one person at the left and right, the wardrobe is slightly inclined backwards, lifted hard, and moved back to the desired position. Be careful not to scratch the floor or the wall.

Facial Cleansing Water

Micellar Cleansing Water,SkinActive Micellar Cleansing Water,Micellar Water,Organic micellar water,Micellar water for oily skin

Ningbo Roni Cosmetic Co,.Ltd , https://www.ronicosmetics.com